Roanoke Switch - Euless Switch 138 kV Line
About the Project
CLIENT
Oncor Electric
LOCATION
Roanoke, Texas
PROJECT TYPE
UAS LiDAR, Construction Survey, As-Build LiDAR
G&AI provided GPS control survey, established horizontal and vertical control/ aerial target points utilizing RTK/GPS methodology. G&AI provided Drone and Ground-Based LiDAR/Video/ Photography, which Required 400ft width of LiDAR XYZ data for approximately 1,800 feet. Feature-coded PLS CADD data for 200 ft width of the 400 ft corridor. Provided ROW video and oblique structure photography. G&AI also provided ROW Survey/staking, Geotech Staking, and construction structure staking. Staked the existing ROW edge for vegetation management limits. Staked Locations requested for soil borings along the transmission line ROW and staked 3 proposed structures. As well as provided Drone LiDAR as-built survey in accordance with Oncor’s specifications.
About the Project
Komatsu worked with the City of Grand Prairie to plan and design their first branch library in 2001. The City returned to Komatsu in 2016 when they wanted to renovate and enlarge the original 10,000 sq. ft. facility to 16,550 sq. ft. This project was phased in order for the library to remain occupied for as long as possible. Added square footage is dedicated to technology and new concepts in library design allowing for more program space. Construction was completed on time and on budget.
CHARACTERISTICS:
– Children’s and Adult’s Programming Areas
– 6 Staff Work Stations
– 2 Manager Offices
– 10 Computer Stations
– Self-Checkout Stations
LOCATION: Grand Prairie, TX
PROJECT TYPE: Renovation and Expansion
COMPLETED: February 2019
REFERENCE:
Amy Sprinkles, Library Director
(972) 237-8140
[email protected]
get in touch
We're Here to Help!
Our team is happy to answer your questions. Contact us and we’ll be in touch as soon as possible.