Limestone-Watermill 345kV New Transmission Line

About the Project

CLIENT
Oncor Electric Delivery


LOCATION
Freestone, Limestone, Navarro, Ellis, Counties Texas


PROJECT TYPE
Boundary Survey, Construction Staking, Deed Research, GPS and Geodetic Control Survey, LiDAR, Photogrammetric Mapping, Right-of-Way Survey, Topographic Survey

This project involved the design of 90 miles of 345kV, double circuit, transmission lines. G&AI’s scope of work included all deed research of the current ownership along the proposed route, mapping with aerial photography for condemnation hearings, boundary surveying, topographic surveying of the proposed centerline, overhead utility surveying and supplemental surveying in heavily wooded areas to insure the validity of the LiDAR flight, along with right-of-way staking for vegetation management, borehole staking and construction staking of lattice towers.

This project involved the design of 90 miles of 345kV, double circuit, transmission lines. G&AI’s scope of work included all deed research of the current ownership along the proposed route, mapping with aerial photography for condemnation hearings, boundary surveying, topographic surveying of the proposed centerline, overhead utility surveying and supplemental surveying in heavily wooded areas to insure the validity of the LiDAR flight, along with right-of-way staking for vegetation management, borehole staking and construction staking of lattice towers.

Our team is happy to answer your questions. Contact us and we’ll be in touch as soon as possible.

Scroll to Top